Bathroom remodeling in Montclair, NJ
AB Contracting & Design works out of 65 Newark Ave, Unit 1, Belleville, NJ 07109, 3.2 miles from Montclair. Three in five Montclair homes were built in 1939 or earlier, so a bathroom remodel here usually happens inside an old building: we plan for what the walls and floor hide, from demolition and plumbing to tile, glass and paint.
- Bathroom remodels from $12,000 including material, the same starting price as everywhere we work.
- Montclair's plumbing fee is $20 a fixture with an $85 minimum, up from $12 and $50 before February 2025.
- Montclair's permit page says completed applications must be hand-delivered. We file ours at 205 Claremont Avenue and meet the inspectors. N.J. HIC #13VH11431800.
Get a bathroom estimate in Montclair
Send the details and Andrew will get back to you. Phone estimates are free.

Most Montclair homes were built before 1940
Of Montclair's 16,521 homes, 9,809 were built in 1939 or earlier: 59.4%, against 29.1% across Essex County and 17.4% across New Jersey. That is more than half of the township, so the median Montclair home falls in the census's oldest bracket.
85.7% were built before 1980, which matters to landlords: Montclair's lead-paint inspections of rentals exempt dwellings built in 1978 or later. Most households own their home (56.9%), and 43.1% rent.
| Homes | Montclair | Essex County | New Jersey |
|---|---|---|---|
| Built 1939 or earlier | 59.4% | 29.1% | 17.4% |
| Built before 1980 | 85.7% | 74.2% | 62.8% |
| Median year built | 1939 or earlier | 1958 | 1970 |
| Households that rent | 43.1% | 55.1% | 36.2% |
U.S. Census Bureau, American Community Survey 2020–2024 estimates, tables B25034, B25035 and B25003 (Census Reporter). Percentages worked out from the published counts. The median year built is reported in the table's lowest bracket, 1939 or earlier.
What that means for a bathroom in an older Montclair house
- Price after the walls are open. A bathroom in a house this old can hide original drain and supply pipes, a floor that is no longer level, and wiring put in long before a fan and GFCI outlets. Anything that has to change is written up as a change order and signed before the work is done.
- Licensed trades on the permit. Montclair's code allows plumbing and electrical work only by licensed people, apart from a homeowner working on a single-family home of their own. Our plumbing is done by a master-licensed plumber and our wiring by master-licensed electricians.
- Plans on site. The Building Department says its inspector will not conduct an inspection without the permit plans on site, so they stay at the house for the length of the job.
- Permits closed before a sale. Montclair needs no new certificate of occupancy for a sale, but every open construction permit has to be closed first. We close ours with a final inspection.

Two kinds of water, and a lead service line program
Montclair buys reservoir water from the North Jersey District Water Supply Commission, and its system also includes three wells of its own, one in each pressure zone. The Water Bureau's 2025 report says two of the wells will run in the spring and summer of 2026 with carbon filters, and that no well will run without carbon treatment. It lists the well water, sampled in 2023, at 350 parts per million of hardness, above the recommended upper limit of 250, and at 547 parts per million of dissolved solids, above the recommended limit of 500. The reservoir water is 42 for hardness (2025 water quality report). The report does not say which water reaches a given street or season, so it pays to plan for the harder one: shower glass, faucets and grout that are easy to clean of scale.
The Township's water mains contain no lead, but the service line from the main to a house may, "especially if your building was constructed before 1940". Montclair's 2026 program replaces lead, galvanized and brass service lines, and the Water Bureau says it is expected to be provided at no cost to eligible homeowners (Water Bureau). On the homeowner's side, the Township's July 2026 inventory lists 128 lead, 220 galvanized and 78 brass lines and 374 of unknown material, out of 10,848 entries (inventory; counted from the list).
If your service line is listed as lead, galvanized, brass or unknown
- The Water Bureau asks for a photo of the service line where it enters your home, with your contact information, emailed to DoIhavelead@montclairnjusa.org. It says that without that email it cannot schedule a visit, and a line of unknown material has to be verified before it can join the program.
- The service line is the Water Bureau's program. The supply pipes inside the walls are not, and the report reminds owners it cannot control the materials in a home's own plumbing. A bathroom remodel opens the walls where those pipes run, so we show you what we find and price any replacement before it is done.

Montclair's bathroom permit, office and fees
Permits come from the Building Department on the second floor of the Municipal Building, 205 Claremont Avenue, open Monday to Friday from 8:30 a.m. to 4:30 p.m. (Building Office). Completed applications must be hand-delivered, and payments are accepted from 8:30 a.m. to 2:30 p.m. (permit page). The department has 20 business days to approve or deny an application, calls when the permit is ready to pick up and pay for, and issues a placard to display where it can be seen from the street, such as a front window (permit process).
The fee lines a bathroom permit usually touches
- $20 for each plumbing fixture, such as a toilet, sink, bathtub or shower stall.
- $85 minimum for any plumbing permit, and the same minimum for a basic construction permit.
- $34 per $1,000 of estimated cost for renovations, alterations and repairs up to $50,000, then $26 per $1,000 from $50,001 to $100,000.
- Plan review is 20% of the construction permit amount, and it is nonrefundable.
- $50 for a water heater, counted as a plumbing appliance, and $100 for a hydromassage tub on the electrical permit.
Worked through for plumbing alone: a remodel that replaces a toilet, a sink and a shower is 3 fixtures, or $60, so the $85 minimum applies. These rates came in with an ordinance heard on February 25, 2025, which raised the fixture fee from $12, the renovation rate from $18 per $1,000 and the plumbing minimum from $50 (Ord. O-25-04). The Construction Official sets the final amount (Chapter 121).
Work hours, weekends included
Montclair's noise code allows construction on weekdays from 7:00 a.m. to 6:00 p.m., including setting up at the site, and on Saturday and Sunday from 9:00 a.m. to 4:00 p.m. Work outside those hours needs the Construction Official's permission: a permit of up to three days at a time in case of urgent necessity for public health and safety, or permission for work between 6:00 p.m. and 7:00 a.m. when the official finds that public health and safety will not be impaired and that loss or inconvenience would otherwise result. So a Saturday of tile cutting is possible here, but it ends at 4.
A dumpster on the street
A roll-off on a Montclair street or a Township-owned parking lot needs a permit from the Chief of Police, with a $25 filing fee unless the Council has set another by resolution. The code asks for a street at least 30 feet wide from curb to curb, a container parallel to the curb with yellow reflective panels, nothing on the sidewalk, and $1,000,000 of liability cover for each occurrence; the permit lasts 30 days. The police application form asks why the dumpster cannot go on private property, so a driveway is the first place we look.
Historic districts: the inside is not reviewed
Montclair has four local historic districts: Town Center, Pine Street, Upper Montclair and Watchung Plaza. The Township describes Pine Street, 77 structures, as a neighborhood of single-family and multi-family homes and small-scale commercial properties. At a landmark or in a district, the preservation code requires the Historic Preservation Commission's certificate of appropriateness before a permit for an exterior change, and lists changes to interiors, changes the public cannot see and identical replacement windows among the actions that need no review. If a bathroom job there needs a new window opening or a vent on a wall the public can see, the Township's November 2026 application asks for a $100 fee, a separate escrow check with a W-9 form ($500 for a façade improvement, $150 for a conceptual review), and fifteen copies of the application with photographs.
Selling or renting after the remodel
The Township's June 2025 notice says Montclair does not require a new certificate of occupancy for a sale, mortgage or refinancing, but all current construction permits and any open violations must be closed out before closing. A new certificate is still needed for a change of use.
Before a one- or two-family house is sold, the seller needs a Smoke Detector Compliance Certificate from the Fire Prevention Bureau. Under the code as amended on August 11, 2026, a one-family house pays $115 when the request arrives more than 10 business days ahead, $140 at 4 to 10 days and $165 inside 4.
If the bathroom is in a rental unit
- Montclair inspects certain rental dwellings for lead-based paint hazards, and those built in 1978 or later are exempt. A visual assessment by the Township's lead inspector is $80 a unit, or the owner can hire a private inspector certified by the state; filing a lead-safe certification is $20, plus a $20 state fee per unit inspected unless it was already paid to the state. A lead-safe certification is valid for two years, and the owner gives each new tenant a copy with the lease (lead-based paint inspections).
- When a rental unit changes occupancy, the fire prevention code requires an inspection for a Certificate of Compliance, at $75 a unit.
- Our part: a finished bathroom, ready for the inspector, with the permit closed.
How we run a Montclair bathroom job
The old finishes come out, the plumbing and wiring are set before the walls close, the wet areas get a waterproofing membrane, then tile, fixtures and glass. One crew runs the job, with a master-licensed plumber and master-licensed electricians, and Andrew is the person you call.
Our office is on Newark Avenue in Belleville, and the towns we cover are listed on our service area page. The rest of the process, from the free phone estimate to the written contract New Jersey requires, is the same as on any of our bathroom remodels.
Bathroom remodeling near Montclair
- Belleville and Essex County, where our office is
- Bathroom remodeling in Bloomfield, 1.7 miles from our office
- Bathroom remodeling in Glen Ridge, 1.9 miles from our office
- Bathroom remodeling in East Orange, 2.2 miles from our office
- Bathroom remodeling in Nutley, 2.8 miles from our office
- Bathroom remodeling in Orange, 3.2 miles from our office
- Bathroom remodeling in Newark
Montclair bathroom questions
How do I get a bathroom permit in Montclair?
By hand. The Building Department's permit page says all completed applications must be hand-delivered to the department, on the second floor of the Municipal Building at 205 Claremont Avenue, and that payments are accepted from 8:30 a.m. to 2:30 p.m. with no exceptions. The department has 20 business days to approve or deny an application, calls when the permit is ready to pick up and pay for, and issues a placard to be shown where it can be seen from the street, such as a front window. We prepare and file the permit for your job.
What does a bathroom permit cost in Montclair?
Montclair's plumbing fee is $20 for each fixture, with an $85 minimum for a plumbing permit, and renovation work is $34 per $1,000 of estimated cost up to $50,000. Plan review is 20% of the construction permit amount and is nonrefundable. Three fixtures come to $60, so the $85 plumbing minimum applies. These rates date from an ordinance heard on February 25, 2025; before it, a fixture was $12. The Construction Official sets the final amount.
Can a contractor work on a Montclair bathroom on the weekend?
Yes, within set hours. Montclair's noise code allows construction on weekdays from 7:00 a.m. to 6:00 p.m., including setting up at the site, and on Saturday and Sunday from 9:00 a.m. to 4:00 p.m. Outside those hours, work needs the Construction Official's permission: a permit of up to three days at a time in case of urgent necessity for public health and safety, or permission for work between 6:00 p.m. and 7:00 a.m. when the official finds that public health and safety will not be impaired and that loss or inconvenience would otherwise result.
Our house is in a Montclair historic district. Does the bathroom need the Historic Preservation Commission?
Not for the inside. Montclair's historic preservation code lists changes to interiors among the actions that need no certificate of appropriateness. At a landmark or in one of the four local historic districts, a change to the outside that the public can see, such as a new window opening or a vent on a street-facing wall, needs the Commission's certificate before the permit is issued. The Township's November 2026 application asks for a $100 fee plus a separate escrow check, $500 for a façade improvement. An identical replacement window does not need a certificate.
We are selling our Montclair house after the remodel. What does the town need?
The Township's June 2025 notice says Montclair does not require a new certificate of occupancy for a sale, mortgage or refinancing, but every current construction permit and any open violation must be closed out before closing. Before a one- or two-family house is sold, the Fire Prevention Bureau also issues a Smoke Detector Compliance Certificate; for a one-family house the code sets the fee at $115 when the request arrives more than 10 business days ahead, rising to $165 inside four business days.
How much is a bathroom remodel in Montclair?
Our bathroom remodels start at $12,000 including material, the same starting price as everywhere we work. Phone estimates are free; an in-person estimate is $50, credited to your contract when you sign.
Sources
All read on November 24, 2026.
- Montclair Code Chapter 121, Construction Codes, Uniform (§§ 121-3, 121-4)
Licensed trades, plan review, minimum fee, renovation rates, plumbing fixtures and appliances, hydromassage tubs.
- Township of Montclair, Ordinance O-25-04 (public hearing February 25, 2025)
The previous and current fee amounts.
- Montclair Building Office, contact details
The Building Department's floor at 205 Claremont Avenue and its office hours.
- Montclair Building Department, building inspection and permits
Hand-delivered applications and payment hours.
- Montclair Building Department, construction permit process: an overview
20 business days, pick-up and payment, the placard, plans on site.
- Montclair Code Chapter 217, Noise (§ 217-7)
Construction hours on weekdays and weekends; urgent work permits and evening permission.
- Montclair Code Chapter 260, Roll-Off Containers and Dumpsters
Police permit, $25 fee, street width, placement, panels, insurance, 30 days.
- Montclair Police Department, dumpster permit application
Why the dumpster cannot be placed on private property.
- Montclair Code Chapter 347, Article XXIII, Historic Preservation (§§ 347-136, 347-138)
When a certificate of appropriateness is required, interiors exempt, $100 filing fee.
- Township of Montclair, local historic districts
The four districts and the Pine Street description.
- Montclair Historic Preservation Commission, certificate of appropriateness application (November 2026)
The $100 fee, the escrow checks and W-9 form, fifteen copies and photographs.
- Montclair Water Bureau, Water Quality Report, reporting year 2025
Water sources, the wells' 2026 operation, well and reservoir hardness, dissolved solids, home plumbing materials.
- Montclair Water Bureau, 2026 Lead Service Replacement Program
Mains without lead, buildings before 1940, expected cost, eligibility and the photo email.
- Montclair Water Bureau, service line inventory, July 2026
Customer-side lead, galvanized, brass and unknown lines, counted from the list's 10,848 entries.
- Montclair Building Department, notice about certificates of occupancy (June 2025)
No new certificate at sale; permits and violations closed before closing; change of use.
- Montclair Code Chapter 153, Article I (§ 153-1), as amended August 11, 2026
Smoke Detector Compliance Certificate fees; the $75 rental change of occupancy inspection.
- Montclair Code Chapter 190, lead-based paint inspections
Rentals built in 1978 or later exempt, the $80 visual assessment, the $20 filing and state fees, two-year certification, tenant copy.
- U.S. Census Bureau, American Community Survey 2020–2024 (5-year), Montclair township (via Census Reporter)
Year built (B25034, B25035), tenure (B25003).
Remodeling a bathroom in Montclair? Talk it through with Andrew.
Call to talk the job through with Andrew, or send the details and Andrew will get back to you. An in-person estimate is $50, and it comes off your contract when you sign.