Before you take the tub out
Most conversions put the shower in the space the tub used, so the bathroom's layout stays the same and only the wet area changes. Three decisions shape the job and its price:
- The entry. A low curb keeps the shower floor at the height of the old tub floor. A curbless shower needs the floor framing lowered or reworked so the shower floor can slope to its drain, which is structural work under the bathroom.
- Tile or panels. Tiled walls are priced by the square foot and give you the choice of size, pattern and a recessed niche. Wall panels have few or no grout lines to keep clean.
- The glass. A fixed panel leaves one side open. A hinged or sliding door closes the shower in. Either one has to be safety glass.
One more question is about the house, not the bathroom: if this is the only tub, small children are usually bathed in a tub. With a second full bathroom, converting this one leaves you both.
The order of the work
The order of the work matters: the drain and the valve have to be right before the floor is built, and the waterproofing has to be done before any tile goes up.
- 1Measure the tub alcove and decide the entry: a low curb, or a curbless floor that needs the subfloor lowered.
- 2Check with the town. A shower in place of a tub usually changes the drain and the valve, so it is not a like-for-like swap.
- 3Take out the tub, its wall tile and the wall board behind it. An old cast-iron tub is heavy and can be broken up in place.
- 4Open the floor at the drain, set the new shower drain and move the valve to a comfortable height. Inspect if a permit was pulled.
- 5Build the shower floor: a sloped mortar bed or a factory pan, with a waterproofing membrane over the floor and up the walls.
- 6Hang cement board or a waterproof board on the walls and tile, or install a wall panel system.
- 7Set the glass: a fixed panel or a door, in safety glass.
- 8Trim, caulk and a final inspection where one is required.
Plumbing on our jobs is done by a master-licensed plumber and electrical by master-licensed electricians, so the rough-in is right before the walls close. What the tile and the waterproofing under it cost.

The New Jersey permit, in plain terms
New Jersey's construction code (N.J.A.C. 5:23-2) sorts bathroom plumbing work into three groups. Here is where a conversion falls.
Not ordinary maintenance (5:23-2.7)
The code's ordinary maintenance list, which needs no permit and no notice, covers swapping a fixture for a similar one with no change to the piping, and replacing faucets and shower or tub valves. A shower in place of a tub usually moves the drain and the valve, so it falls outside that list.
Usually minor work in a one- or two-family house (5:23-2.17A)
New fixtures in existing space are minor work, as long as the water lines, the water service and the house drain don't need to get bigger. Minor work can start once the construction office has notice, and the permit application follows within five business days.
A permit before work starts (5:23-2.14)
Anything that alters a joist or a beam, such as cutting the floor framing down for a curbless shower, needs the permit first. We ask the town's construction office before work starts and file the permit the job needs, so the inspection happens while the floor and walls are still open.
Each town sets its own fees. Belleville charges $15 for each plumbing fixture and Bloomfield $25. How a New Jersey construction permit works, and what it costs.
Safety glass is not optional
The International Residential Code treats glass in the walls and enclosures of showers and bathtubs as a hazardous location when its bottom edge is less than 60 inches above the floor you stand on (R308.4.5). Glass there has to be safety glazing. Glass more than 60 inches away, measured across the floor from the edge of the shower, is the exception.
New Jersey adopted the 2024 edition of that code on July 15, 2026, and it took effect on August 17, 2026 (adoption notice). What the 2024 code change means for a project.
What it costs, from our published prices
We don't quote a conversion before we see the bathroom, because the drain, the floor and the walls behind the old tile decide the price. These are the published prices it is built from:
| Part of the job | Our published price |
|---|---|
| Tile, 3 × 5 ft shower, three walls 8 ft high and the floor (103 sq ft) | $1,030 to $2,060 labor |
| Plumbing fixture install | From $950 labor, per fixture |
| Drywall in the rest of the room, if it is opened | $220 per 4 × 8 sheet, hung and finished |
| Full bathroom remodel, if the whole room is done | From $12,000 including material |
The tile area is the worked example on our tile installation cost page: (5 + 3 + 3 ft) × 8 ft of wall plus 15 sq ft of floor. Material, the glass and the town's permit fees are on top of the labor figures.
Converting a tub in an older house around Belleville
In Belleville and the five towns in the table below, between 52.5% and 86.0% of homes were built before 1960. A bathroom that old can hide original drain and supply pipes, a floor that is no longer level, and wiring put in long before today's fans and lighting. We look at all of it when the tub and the old tile come out, and anything that has to change is written up as a change order, priced and signed before the work is done.
| Town | Built 1939 or earlier | Built before 1960 | Owner-occupied |
|---|---|---|---|
| Belleville | 32.4% | 61.2% | 55.9% |
| Bloomfield | 37.7% | 64.0% | 50.7% |
| Glen Ridge | 81.1% | 86.0% | 91.1% |
| East Orange | 32.1% | 55.2% | 31.0% |
| Nutley | 31.3% | 63.2% | 70.3% |
| Orange | 28.0% | 52.5% | 25.5% |
U.S. Census Bureau, American Community Survey 2020–2024 estimates, tables B25034 (year built) and B25003 (tenure), via Census Reporter. Year-built shares are of all housing units; owner-occupied is the share of occupied homes.
Where most homes are rented or sit in larger buildings, as in East Orange and Orange, a conversion in one unit can touch pipes shared with the units above and below. In a condominium the association's rules may also apply. We find out before the tub comes out.