One team, in the right order
A kitchen is the room where the trades collide: plumbing and electrical have to be roughed in before walls close, cabinets have to be set before counters are templated, and the backsplash waits for the counters. We run all of it on one schedule with our own builders, plumbers and electricians, which is how a kitchen stays on track.
This is the order a full kitchen remodel runs in:
- Estimate. Free by phone, or $50 in person, credited to your contract when you sign.
- Proposal, priced line by line, so you can see what each part of the kitchen costs and compare it against any other bid.
- Written contract with the start and finish dates, the total price and the cancellation notice New Jersey law requires.
- Permits, if the work needs them (see below), filed with your town's construction office.
- Demolition and disposal, with the floors and the rest of the house protected.
- Rough plumbing, gas and electrical, inspected before the walls close when a permit was pulled.
- Drywall, then cabinets, then counters templated to the installed cabinets.
- Backsplash tile, fixtures, appliance hookups, trim and paint.
- Final inspection where one is required, and the last payment at completion.
Kitchens in older Essex County houses
Belleville's housing is old: the median home was built in 1951, and 48% of the township's homes date from before 1950, according to the Census Bureau's 2024 American Community Survey. Across Essex County, 30% of homes were built in 1939 or earlier. Most of it is houses: 42% of Belleville homes are detached single-family houses and another 20% are two-family houses, and 56% of households own their home.
In a kitchen that old, what is behind the cabinets matters as much as the cabinets. Walls and floors are often out of level or square, so cabinets have to be shimmed and scribed to fit. Wiring may predate today's appliances, and drain and supply lines may be original. We check them when the old kitchen comes out, and anything that has to change is written up as a change order, priced and signed before the work is done, as New Jersey law requires.
Do you need a permit to remodel a kitchen in New Jersey?
Not always. New Jersey's Uniform Construction Code treats some kitchen work as ordinary maintenance, which needs no permit: painting, new flooring, replacing cabinets, and swapping a fixture, outlet, switch or light for a similar one without changing the piping or wiring (N.J.A.C. 5:23-2.7).
A permit is needed once the work changes the systems or the structure: moving the sink or gas line, adding circuits for new appliances, or replacing a quarter or more of the wall surface. Work inside an existing house is reviewed under the state's rehabilitation subcode. Since August 17, 2026 New Jersey reviews electrical work under the 2023 National Electrical Code, which no longer requires an outlet on a kitchen island. We check with your town's construction office and pull what the job requires.
Your contract, under New Jersey law
Any home improvement over $500 has to be in a written contract signed by both sides, with the total price and the dates the work starts and finishes (N.J.A.C. 13:45A-16.2). It must also tell you that you can cancel for any reason until midnight of the third business day after you get your copy (N.J.S.A. 56:8-151).
To be registered, a New Jersey home improvement contractor has to show commercial general liability insurance of at least $500,000 per occurrence and workers' compensation insurance unless exempt, and every written contract has to include a copy of the liability insurance certificate with the insurer's phone number (N.J.S.A. 56:8-142 and 56:8-151, as amended by P.L.2023, c.237).
Our registration number, 13VH11431800, is on every contract and estimate. Our payment schedule is in the contract too: a deposit of 25% to 50%, 25% at an agreed milestone, and the last 25% at completion.
How the price comes together
Every kitchen is priced from its own layout and finishes, and the proposal shows it line by line. Our published trade prices give a sense of the pieces: plumbing fixture installs from $950, electrical fixture installs from $300, tile from $10 to $20 per square foot, and drywall at $220 a sheet hung and finished.
The biggest variables are the cabinets and counters you choose and whether the layout changes. Keeping the sink, range and refrigerator where they are keeps the plumbing, gas and electrical simple, and usually keeps the job out of the permit office. Moving them is often worth it, and the proposal shows what it costs.
Where we remodel kitchens
Our office is at 65 Newark Avenue in Belleville. The closest towns are Bloomfield (1.7 miles), Glen Ridge (1.9), East Orange (2.2), Nutley (2.8), and Orange and Montclair (3.2 each), and we work in every town in Essex, Union and Passaic counties.
Commercial kitchens
We also build commercial kitchens, with exhaust hoods, ventilation and fire suppression over the cook line. The Abuelo's Steakhouse kitchen in Bloomfield went from a small existing kitchen to a commercial cook line with six-burner ranges and a fryer under a stainless hood.