What a heated bathroom floor costs to install
An electric heated floor is a thin cable, either pre-looped on a mesh mat or clipped into a membrane. It sits in the thinset under the tile. A floor sensor and a wall thermostat switch it on and off. Here is what each piece costs for a heated area of 36 sq ft, about the open floor of a 60 sq ft bathroom once the tub, vanity and toilet are left out.
| Part | Price | Source |
|---|---|---|
| Heating mat, 120 V, 36 sq ft | $519 | WarmlyYours TempZone roll |
| Floor thermostat with built-in GFCI | $159 to $259 | WarmlyYours price list |
| Electrician: circuit, thermostat box, hookup | $200 to $500 | WarmlyYours, national range |
| Heated floor, total | $878 to $1,278 | Sum of the three rows |
| Tile labor over it, per sq ft | $10 to $20+ | Our tile price |
The tile line is there in any bathroom remodel, heated or not. So the heated floor itself adds roughly $878 to $1,278. Mat and thermostat prices are WarmlyYours' own list prices on November 9, 2026. The electrician's range is WarmlyYours' national figure. It says the price depends on local rates, wall access and whether a new dedicated circuit is needed.
Not in that total, and priced house by house:
- Panel work, if the electrical panel has no open space for one more breaker.
- Subfloor repair or new underlayment, when the old floor fails the manufacturer's rules (below).
- Insulation under the floor, when the bathroom sits over a cold basement, crawlspace or garage.
- Your town's electrical permit fee. Each New Jersey town sets its own.
Manufacturers build these systems to different outputs. That changes both the price and the bill:
- WarmlyYours TempZone rolls: 15 watts per sq ft.
- Schluter DITRA-HEAT 120 V cable: 12.7 watts per sq ft at its regular spacing, 15.2 at its tighter spacing.
- SunTouch TapeMat: 12 watts per sq ft (D12 and C12 series) or 15 (C15 series, masonry floors only).

What it costs to run on a PSE&G bill
National guides price the electricity at 16¢ per kWh. WarmlyYours' 2026 cost guide uses that figure. Belleville and the rest of this part of Essex County are PSE&G territory, and PSE&G's tariff gives a higher number. For a household on PSE&G's standard residential rate and default supply, from October through May, each kWh costs:
- Distribution: 4.87¢.
- Supply (energy and capacity): 12.91¢.
- Transmission: 6.88¢.
- State program charges and credits: 0.66¢ net.
- Total: 25.3¢ per kWh, sales tax included. That is 58% above the 16¢ national figure.
Here is what that means for a 540 watt floor, the 36 sq ft mat priced above. The figures assume the mat runs at full power the whole time. The floor sensor switches it off once the tile reaches its setting, so a real bill is at or below these.
| Rate | Per hour | 3 h a day, 30 days |
|---|---|---|
| PSE&G standard, Oct–May25.3¢ per kWh | 13.7¢ | $12.31 |
| National guide, 16¢16.0¢ per kWh | 8.6¢ | $7.78 |
| PSE&G time-of-use, off-peak (midnight–6 am)10.2¢ per kWh | 5.5¢ | $4.96 |
| PSE&G time-of-use, mid-peak26.0¢ per kWh | 14.0¢ | $12.64 |
| PSE&G time-of-use, on-peak (4–9 pm weekdays)38.3¢ per kWh | 20.7¢ | Weekday evenings only |
- A whole season: November 1 to March 31 at three hours a day is at most 245 kWh, or $61.95 at the standard winter rate.
- On a time-of-use plan, set the schedule. A floor warming during the 4 to 9 pm weekday window pays 38.3¢ per kWh. The same floor before 6 am pays 10.2¢.
- Using a third-party supplier? Swap your supplier's price in for PSE&G's 19.8¢ of supply and transmission.
- It lands on the electric bill, not the gas bill. 73% of Belleville homes heat with utility gas and 14% with electricity, per the Census Bureau. The floor is an electric add-on either way.
What the electrical side needs
Since August 17, 2026, New Jersey's electrical subcode is the 2023 National Electrical Code (N.J.A.C. 5:23-3.16, DCA). Permit applications filed complete by February 17, 2027 may still be reviewed under the previous code (DCA, Fall 2026). The Code has required ground-fault protection for electrically heated bathroom floors since its 1999 edition (IAEI Magazine). Here is what the three manufacturers' manuals ask for:
- A circuit sized to the mat. A 36 sq ft, 120 V roll draws 4.5 amps. SunTouch's table: up to 12 amps on a 15 or 20 amp breaker with 14 AWG wire; up to 15 amps on a 20 amp breaker with 12 AWG. Over 15 amps takes a second circuit or a relay.
- Its own circuit, or a careful share. Schluter recommends a dedicated circuit, or one feeding only fixed room heaters, loaded to no more than 80% of the breaker. SunTouch allows an existing circuit with room for the mat plus a hair dryer, but not one with lights, motors or exhaust fans.
- Class A GFCI protection on every circuit. Schluter calls for a Class A (5 mA) ground fault circuit interrupter on each circuit. The Schluter, SunTouch and WarmlyYours floor thermostats have one built in, so a GFCI breaker is not needed with them.
- A floor-sensing thermostat in a deep box. Each heating system needs its own thermostat or power module and a floor sensor. SunTouch specifies an extra-deep box, at least 4 feet from the shower opening.
- Three resistance tests. SunTouch and WarmlyYours both log the cable's resistance out of the box, once it is fastened down, and after the floor covering goes on. A failed reading after tile means lifting tile.
- An electrical permit, filed by a licensed electrician. A new circuit is not on the ordinary electrical maintenance list in N.J.A.C. 5:23-2.7, so it needs a permit. If it counts as minor work, work may start on notice to the town, with the application within five business days (5:23-2.17A). Only a licensed electrician, or a single-family homeowner on their own house, may do the wiring (5:23-2.15).
One Belleville detail on that last rule: 20% of the town's homes are in two-unit buildings (Census Bureau). The do-it-yourself exception in N.J.A.C. 5:23-2.15 covers a single-family homeowner only. In a two-family house, the wiring goes to a licensed electrician.
Older Belleville houses: the panel, the subfloor and the cold underneath
Belleville's median home was built in 1951. 48% of its homes date from before 1950, and 32% from 1939 or earlier (Census Bureau, ACS 2024). Three things decide whether a heated floor in a house that age is a simple add-on or a bigger job.
1. The electrical panel
The mat needs a breaker of its own, or a circuit with spare room under the rules above. A panel with an open space makes it a short job. A full panel means the electrician has to make room first, and that is a separate line on the quote. Ask the electrician to look at the panel before the tile is chosen, not after.
2. The subfloor
Tile over a heating cable is only as good as the wood under it. Schluter's handbook sets the minimums for its DITRA-HEAT system:
- Joists 16 inches apart: one layer of plywood or OSB at least 19/32" (5/8" nominal), tongue and groove.
- Joists 19.2 inches apart: at least 23/32" plywood or OSB.
- A board (plank) subfloor: planks at least 3/4" thick plus plywood or OSB underlayment at least 15/32", joists no more than 24 inches apart.
- Lauan plywood and particle board underlayment cannot sit directly under the membrane. They come out or get replaced with plywood or OSB.
Opening the floor is when you find out which one you have. The fix is new underlayment, and it is far cheaper before tile than after.
3. What is under the bathroom
Heat goes down as well as up. SunTouch's manual says insulation is required for best performance. On a well-insulated wood subfloor, it says most floors can be heated up to 20°F warmer than they would otherwise be. A bathroom over an unheated basement, crawlspace or garage loses much of that through the floor. Sealing and insulating that space is the same building work our frozen pipes guide walks through for the pipes below a cold floor.

How a heated floor fits a bathroom remodel
A heated floor goes in only when the bathroom floor is open, so the decision belongs to the remodel. The order, from the manuals:
- Decide where the heat goes during design. No mat under cabinets or built-ins with no floor clearance (SunTouch). Keep the cable 4 to 6 inches from walls, tubs and drains, and 6 inches from the toilet's wax ring. WarmlyYours' example heats 38 sq ft of a 60 sq ft bathroom.
- Demolition down to the subfloor. Then the subfloor gets checked against the rules above, and any underlayment fix happens now.
- Electrical rough-in. The new circuit and the thermostat box go in with the rest of the bathroom wiring, and get inspected before the walls close when a permit was pulled.
- Cable or mat, then the floor sensor. Tested for resistance before and after it is fastened down.
- Thinset or self-leveler, then tile. The cable is fully embedded. A final resistance test follows.
- Wait before turning it up. SunTouch says never put the system into full operation until the cement materials are fully cured, typically two to four weeks.
That is why the heated floor belongs in the bathroom plan from the first visit. Our bathroom remodeling page shows how we run a remodel from demolition to tile, with plumbing and electrical on the same schedule. Our bathroom remodels start at $12,000 with material. The bathroom remodel cost guide breaks that down line by line.

